Mon–Fri: 6 AM–10 PM, Sat–Sun: 7 AM–11 PM(971) 626-0086

Slab foundation building in Sherwood OR - a floor that starts on solid ground

Planning a new home, addition or shop on a slab? We dig out and pack the ground first so your floor has something solid under it.

Stamped concrete patio with outdoor dining and lounge furniture beside a light blue house.

What does building a slab foundation in Sherwood involve?

Slab foundation building in Sherwood, OR means pouring a concrete floor straight onto prepared ground, called a slab-on-grade, which later carries your home's carpet, tile or wood flooring. Most of the job happens before the concrete truck shows up, in the digging, packing and layers that go under it.

Most folks call us when they're planning a new home, an addition or a shop, and the price mostly turns on the slab's size, how much soft ground has to come out, and what goes under the concrete for the flooring you have in mind. The schedule turns on the permit, so we settle at the estimate who applies for it and help with the paperwork when your project needs it. The estimate comes with a written scope that lists each step, so you can see what you're paying for. If your plans call for walls and footings instead of a slab, that's our foundation installation work.

Why Sherwood owners pick us for slab foundations

You'll get careful work on the part of the slab nobody sees, and the job is satisfaction guaranteed. Here's what else you can count on.

  • The owner on your site

    I come out myself to look at the ground and write the estimate, then work with the crew through the pour.

  • In business since 2021

    I learned this trade from the ground up on someone else's crew before starting our business in 2021.

  • Fully licensed and insured

    We're fully licensed and insured, and I'm happy to go over both with you at the estimate.

  • Answers to small questions

    I'll explain what goes under your slab and why, and no question about it is too small to ask.

  • Flooring plans from day one

    Tell us your flooring plans early so moisture protection is part of the job from the start.

Slab foundation choices to talk through

The right setup depends on what's going over the slab, what the ground is like and what your plans call for, so we go through these together at the estimate.

  • How the slab is reinforced

    A slab can be plain or reinforced with steel rebar, fibers in the mix or post-tensioned cables tightened after the pour. Reinforcement limits how wide cracks open, so check which one each quote includes.

  • Barriers under the slab

    A tight plastic sheet under the slab holds back ground moisture, and with its joints sealed it also helps keep radon out of the house where radon is present.

  • Shop and outbuilding slabs

    A shop or garage slab gets the same dig-out and packing as a house slab, and if you need the lot around it paved too, ask about concrete parking lot building.

Let's talk about your slab foundation

Call (971) 626-0086 or send the form, and I'll come out and walk the ground with you.

Why folks trust Sherwood Concrete with slab foundations

When I was hauling forms as a helper, the slabs that failed usually had a ground problem, not a steel problem. A slab on poor ground is far more likely to fail whatever's inside it, so we dig out and pack the base first. If the budget's tight, I'd rather trim the finish than the base.

Before we pour, we lay the moisture barrier your flooring calls for and set insulation around the slab's edge, which Oregon's Building Codes Division requires on slab-on-grade floors. Then we place the concrete, cut control joints so cracks follow a line we chose, and give it time to cure and harden before anything gets built on it.

Slab foundation questions we hear

How much does a slab foundation cost in Sherwood, OR?

Installed slab foundation work around Portland usually runs about $8 to $22 per square foot, counting materials, labor and site prep, and that's the going rate in the area, not our price. Where your slab lands depends on how much ground has to come out and be packed, the reinforcement, and the barriers and insulation under it. The estimate's written scope shows what's in yours.

Do I need a permit to build a slab foundation in Sherwood?

Yes, because the state's permit rules require one for all new construction, and the person doing the work, you or your contractor, gets it. Work can begin once the permit is issued, so build that time into your plans. We agree at the estimate who applies and help with the paperwork when your project needs it.

Does a concrete contractor need a license in Oregon to build a slab?

Yes, Oregon law generally requires anyone paid for construction work that improves your property to be licensed through the state's Construction Contractors Board. Ask any contractor you're considering for their license before you hire them.

Do tile or wood floors over a concrete slab need moisture protection?

Yes, national industry guidance says a slab needs moisture protection when carpet, tile, wood or resilient flooring like vinyl will cover it. Water vapor coming up through the concrete can loosen flooring glue and lead to damage, trip hazards and possibly mold. The same guidance says the slab should cure, dry out and be tested for moisture before flooring goes in.

How do I check my Sherwood lot for soft soil or flood risk before building?

Type your address into Oregon's HazVu hazard viewer to see mapped hazards like Cascadia earthquake shaking, earthquake soft soil, landslide and 100-year flooding. For a new home, the state's Design Criteria Hub also shows site values such as frost line depth, seismic design category and radon mitigation. Bring what you find to the estimate and we'll talk through what it means for the ground work.

What causes cracks in a new concrete slab?

Most cracks come from concrete shrinking as it dries, temperature swings, heavy loads, or a base that was raked level instead of dug out and packed. The reinforcement covered above limits how wide they open, and the control joints we cut give them a straight line to follow. A packed base is what keeps the slab from sinking along with the dirt.

What happens when you call about a slab foundation in Sherwood?

We plan a slab around your build, your flooring and the permit, so you know what's happening before the first shovel goes in.

  1. Get in touch

    Call (971) 626-0086 or send a message through the form, and we'll set a time for me to come see the site.

  2. I walk the site

    I come out myself and walk the ground with you, looking at drainage, access and anything the slab has to work around.

  3. Your written scope

    You get a written scope listing each step, from what goes under the slab to cleanup, and we settle who handles the permit.

  4. The pour and walk-through

    Once you're ready we pick a date, then the crew and I do the work and walk the finished slab with you before we pack up.

Slab foundation building in Sherwood and nearby cities

We're based in Sherwood and pour slabs in the cities around it, from Tualatin and Tigard to Newberg and Canby. Pick your city below, or call and ask if yours isn't listed.

Ask Sherwood Concrete for a slab estimate

Call (971) 626-0086 or use the form, and if you're near Sherwood but don't see your city listed, ask anyway.